Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 37 results ...

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Ackerman, P J, Jr. (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

  • Type: Thesis
  • Keywords: measurement; standards; compliance; decision making; performance improvement; regulation; professional; critical success factor; probability
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304625670
  • Abstract:
    One of the prominent trends in business organizations today is the attention placed on individual personality traits to predict job performance. Distinct personality characteristics of members of various work groups must be carefully considered so that the assignment of individuals to work teams results in successful behaviors and performance improvements. The particular task assignment to various work groups, and thus assignments to individuals, will affect performance. It is critical that these individuals possess both the abilities and behavioral preferences to create conditions that promote the highest probability for success. Contingent variables will always be present in any decision-based action, particularly in complex situations, however, when an individual holds a native preference for a successful pattern of behaviors in a certain task's realm higher overall organizational performance may be expected. As such, the current study investigates the impact of various personality traits and patterns on critical success behaviors in the Engineering and Architectural profession's project design services. The four project service categories measured in the Critical Success Factors Questionnaire are: Planning (Conceptual Design), Design (Contract Documents), Construction (Administration) and Firm Management duties. The measurement of the individual personalities is accomplished in this investigation through the Myers-Briggs Type Indicator® (MBTI). This psychometric instrument measures one's attitudes in dealing with the outside world, as well as one's preferences for data collection and decision making. On an individual basis, it was predicted that persons with personalities whose preferences were towards openness to new ideas, and resistant to closure of the discovery process, would perform well on planning or conceptual design tasks. It was predicted that those with a preference towards compliance with rules, regulations and thorough adherence to established standards, would outperform on tasks of detailed design. The research work also offered a prediction of high performance from persons with a preference for innovative ideas and openness to alternatives in the administration of construction, and predicted a contrast with personalities that vary from this pattern. Of the 85-person sample, it was found that those possessing a preference for Intuitive data collection (MBTI Dichotomy, N) and Perceiving structure, (MBTI Dichotomy, P), outperformed individuals with preferences for Sensing and Judging, (MBTI Dichotomies S and J), in both Planning and Construction Administration. However, professionals with a personality favoring Judging, outperformed in the duties associated with the Design Phase. Contrary to predictions, the decision processes captured in the Thinking/Feeling MBTI® dichotomy (MBTI T/F) did not meditate the performance in any of the four service categories. The results of the Research indicate a greater utility for personality measures as a diagnostic tool for team and individual performance interventions, rather than a tool for team selection or team-building. The implications of the results of this research, and recommendations for future investigations are discussed.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, Q (2007) An object model framework for interface management in building information models, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, J S (1995) Reliability-based design of a retaining wall, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Mitchell, Z W, Jr. (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Novak, V M (2012) Managing sustainability value in design: A systems approach, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pinero, J C (2003) A framework for monitoring performance-based road maintenance, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Platt, R T (1998) Development of a ready-to-assemble construction system, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Prateapusanond, A (2004) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Sands, K S, II (2014) Ethics education and its relationship to undergraduate construction students' professional ethical sensitivity, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.